







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Boxabl Driveway & Pavers: The Fort Worth Owner’s Guide
We install Boxabl-compatible driveway and paver systems in Fort Worth, with typical projects running $7,000 to $18,000 depending on square footage, substrate condition, and paver grade. Most Boxabl owners call us after noticing paver settlement, edge separation, or drainage pooling around the unit’s perimeter. It usually starts small: a paver shifts near the trailer tongue, or a corner sinks after the first hard rain. Left alone, that minor shift turns into a failed base layer, and you’re looking at a full reset, not a spot repair.
Bradford Remodeling Co Fort Worth is an independent service provider, not affiliated with Boxabl. We do carry a working stock of Belgard and Unilock pavers that match common Boxabl site specs, and we’ll give you a written price before any work starts.
Which Boxabl Models This Applies To

Every Boxabl Casita ships on a steel chassis and gets set on either a concrete slab or a prepared paver pad. The driveway and paver specs depend on what your site plan called for. Most Fort Worth Boxabl owners are working with a 20-foot-wide approach and a pad that extends 40 to 50 feet from the unit’s main door.
Here’s the compatibility gotcha most owners miss: Boxabl’s factory drawings assume a level pad with a compacted aggregate base rated for the unit’s loaded chassis weight, roughly 15,000 to 20,000 pounds depending on interior fit-out. If your pavers were laid over native Texas clay without proper compaction, you’ll see settlement within the first two seasons. That’s not a paver failure; it’s a base failure wearing paver clothes.
When we match pavers on a Boxabl site, we pull measurements from the existing field, not from a catalog photo. Belgard’s Dublin Cobble and Unilock’s Brussels Block are the two most common matches we see on Fort Worth installations. If you’re replacing a section rather than the whole pad, we need at least one intact paver from the original run to match color and texture. OEM Boxabl documentation doesn’t specify a proprietary paver; the factory assumes local contractors will supply code-compliant hardscape. That means aftermarket Belgard or Unilock product is the standard, not a downgrade.
Styles & brands we work with







Signs Your Boxabl Driveway & Pavers Is Failing
- Settlement near the chassis points. The Boxabl frame rests on specific load points. When pavers sink under any of them, you’ve got a base compaction problem. We see this most often on Fort Worth’s east side, where the soil runs heavy clay and doesn’t shed water well.
- Paver edges pulling away from the pad border. This means the edge restraint failed or was never installed. Without restraint, the whole field starts walking outward, one freeze-thaw cycle at a time.
- Standing water against the steel frame. Texas heat won’t wreck the chassis, but trapped moisture against untreated steel will. If water pools where the unit meets the pad, the pavers aren’t graded properly. That’s a leveling issue, not a material issue.
- Cracks running through the paver field, not along the joints. Paver cracks point to a void underneath. The paver becomes a bridge over nothing, and traffic eventually snaps it. In Fort Worth’s clay soil, these voids show up after prolonged dry spells followed by heavy rain.
- Loose sand washing out after every rain. Joint sand should stay put if the base drains correctly. If you’re sweeping sand back into joints every month, water is moving under the field instead of away from it.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

Fort Worth Boxabl driveway and paver replacement runs $7,000 to $18,000 installed. The spread comes from three variables: how much of the old base we can salvage, the paver grade you choose, and the total square footage in play. A full remove-and-replace with a new compacted base on a 400-square-foot pad typically lands around $10,000 to $13,000. Spot repair, where we lift and reset a settled section, can stay under $3,000 if the base underneath is still sound.
Every quote includes excavation, base material, geotextile fabric where required, pavers, edge restraint, joint sand, and a final run with a plate compactor. Curtis Lane reads the job site before he reads the quote, which means our scope doesn’t grow legs mid-project. You get a written price, and that price holds. The work carries our 365-Day Done Right Promise: if anything fails inside the first year, we come back and make it right at no charge.
DIY or Call Us?
You can safely pull up a single loose paver, check the sand bed beneath it, and take photos. You can also watch your drainage after a heavy Fort Worth downpour and mark where water stands. What most homeowners shouldn’t attempt is lifting and relaying a settled field around a 20,000-pound unit. The Boxabl chassis is load-bearing where it sits, and if you undermine the wrong spot while jacking pavers back into place, you can shift the unit’s support. We’ve seen homeowners dig out a sunken edge only to have more of the field slide into the hole.
If the problem is one or two pavers, try the photo-and-mark approach. If the problem is a sinking corner or water pooling against the frame, call us at (682) 204-4897. We’ll give you a straight scope and a firm price before we touch a single stone.
FAQs

A properly installed paver pad with a compacted aggregate base should last 20 to 30 years in Fort Worth’s climate, with joint sand replenishment every 3 to 5 years. The pavers themselves rarely wear out; the base fails first, and that’s almost always a water management or compaction problem. Call (682) 204-4897 if your pad is under five years old and already showing settlement.
Yes, if the settlement is localized to one section and the base underneath still drains and holds compaction, we can lift and reset that section in one day. If the settlement runs across multiple load points or the edge restraint has failed around the whole perimeter, replacement is the honest call. We’ll tell you which one you actually need, and the written quote will show exactly why.
A typical 400-square-foot removal and replacement takes 3 to 5 working days in Fort Worth, including excavation, base rebuild, paver lay, and compaction. Weather can stretch that: we don’t set pavers over rain-soaked base material, ever. A wet week in April costs us a couple of days, not your money. We hold the written price either way.
We keep working stock of Belgard Dublin Cobble and Unilock Brussels Block at our Fort Worth yard because those two lines cover most Boxabl pad matches we run into. Odd colors and custom borders get ordered direct from the manufacturer, which adds about a week. If you’re trying to match an existing field, call (682) 204-4897 and we’ll send someone out to pull a sample and give you a straight answer on availability.
Written by Curtis Lane, Owner, Bradford Remodeling Co Fort Worth at Bradford Remodeling Co Fort Worth, serving Fort Worth and nearby areas.


